Process Includes:
• Stripping the entire front end
• Grinding down to bare metal
• Applying anti-rust protection
• Raptor coating for durability
• Installing new zinc-plated bolts
• Replacing radiator clamps
• Headlight polishing
• Engine bay deep cleaning
Estimated Time: 2 weeks (due to the extensive work involved)
I don’t take shortcuts – everything is done the right way, ensuring long-lasting results. You will also receive full photographic documentation of the entire process.
Optional Add-ons: Since the front end will be disassembled, this is the perfect time to replace the A/C condenser and power steering cooler and fluid (for a slight additional charge.)
Rust Rust Removal & Front-End Restoration
£600.00Price